TABLE OF CONTENTS
Section 3
SPECIFICATIONS
(continued) 17 Figure 3-4 Identification - 150HP / 113KW Water-cooled Model
18 Figure 3-5 Identification - 200HP / 150KW Air-cooled Model
19 Figure 3-6 Identification - 200HP / 150KW Water-cooled Model
20 Figure 3-7 Piping and Instrumentation - 150HP / 113KW
Air-cooled
22 Figure 3-8 Piping and Instrumentation - 150HP / 113KW
Water-cooled
24 Figure 3-9 Piping and Instrumentation - 200HP / 150KW
Air-cooled
26 Figure 3-10 Piping and Instrumentation - 200HP / 150KW
Water-cooled
Section 4
OPERATION
29 4.1 MOUNTING OF VACUUM SYSTEM
29 4.2 VENTILATION AND COOLING
29 4.3 VACUUM SYSTEM PIPING
29 4.4 COUPLING ALIGNMENT CHECK
29 4.5 FLUID LEVEL CHECK
29 4.6 MOTOR ROTATION DIRECTION CHECK
29 4.7 ELECTRICAL PREPARATION
30 4.8 RUPTURE DISK
Section 5
OPERATION
31 5.1 GENERAL
31 5.2 PURPOSE OF CONTROLS
32 5.3 INITIAL START-UP PROCEDURE
32 5.4 SUBSEQUENT START-UP PROCEDURE
32 5.5 SHUTDOWN PROCEDURE
32 5.6 AUTOMATIC RE-START OPTION
Section 6
MAINTENANCE
33 6.1 GENERAL
33 6.2 DAILY OPERATION
33 6.3 MAINTENANCE AFTER INITIAL 50 HOURS
OF OPERATION
33 6.4 MAINTENANCE EVERY 4000 HOURS
33 6.5 FLUID FILTER MAINTENANCE
Continued on next page