EasyManua.ls Logo

Sumake SF501 - Normal Operation

Sumake SF501
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
3. Normal Operation
(1) After all preparatory steps have been competed, load mass screw into the hopper.
(2) Turn power switch on
Load mass screws Turn power switch
(3) Hold the driver unit and press the Y-pipe manually to confirm that a screw is seen at the
tip of the driver at the first time.
(4) Align the screw at the driver tip vertically with the screw hole of the work-piece.
(5) Then, repeat the steps to tighten subsequent screw.
(6)
Operation Demonstration Vertical direction