Do you have a question about the Sumner Roust-a-Bout R Series and is the answer not in the manual?
Procedure for safely moving the Roust-a-Bout without a load.
Procedure for safely moving the Roust-a-Bout with a load.
Steps for safely raising the mast assembly to the required height.
Instructions for connecting the lift cable to the load securely.
Process for safely lifting the load using the winch handle.
Procedure for safely lowering a load using the winch.
Steps for safely lowering the mast assembly.
Guide for safely detaching the mast from the base.
Instructions on how to engage and disengage the caster brakes.
Procedure for storing the Roust-a-Bout handles when not in use.
Explanation of the safety shear pin and its function.
Information about the optional Tee Head Extension Bar for handling bulky loads.
Procedure for attaching and using guy lines for stability at heights.
Daily checks to ensure the Roust-a-Bout is safe for operation.
Periodic checks for wear and damage to critical components.
Specific instructions for maintaining the winch mechanism.
Step-by-step guide for replacing the main lifting cable.
Instructions for replacing the cable used for mast elevation.
Procedure for replacing the equalizing line on the Roust-a-Bout.
Routine checks for overall unit integrity and functionality.
| Construction | Steel |
|---|---|
| Warranty | 1 year |
| Lift Height | 25 ft (7.6 m) |
| Power Source | Manual |
| Operation | Manual |
Loading...