EasyManua.ls Logo

Sungrow Logger1000A - Page 27

Sungrow Logger1000A
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
Step 2 Mark positions for drilling holes with a marker.
Step 3 Drill the holes with a drill according to the marked positions.
Avoid drilling holes in the utility pipes and/or cables attached to back of the wall!
Operation personnel should wear goggles and dust mask throughout the drilling
process to avoid dust inhalation or contact with eyes.
Step 4 Secure the expansion bolts into the holes with a rubber mallet.
If the Logger1000 is installed onto the metal surface, skip performing this step.
User Manual 4 Mechanical Mounting

Table of Contents

Other manuals for Sungrow Logger1000A

Related product manuals