EasyManuals Logo

Sungrow SBR Series User Manual

Sungrow SBR Series
7 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #3 background imageLoading...
Page #3 background image
GD_202111_Sungrow SBR HV Battery Installation Quick Guide with SHRT _V3.0
Page 3 of 6
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our services, changes to this document may occur without notice.
Installation process - SBR128 (4 modules) as an example
1.
Screw feet in (Optional and to be available in Q4 2021).
2.
Place the base at the acceptable position in right way (arrows outward).
3.
Stack up battery modules.
4.
Insert BMU (make sure the DC MCB is off) and screw in.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sungrow SBR Series and is the answer not in the manual?

Sungrow SBR Series Specifications

General IconGeneral
Battery TypeLithium iron phosphate (LFP)
Nominal Voltage51.2 V
IP RatingIP65
CoolingNatural convection
Operating Temperature Range-10°C to 50°C
CommunicationCAN
Protection LevelIP65
Cycle Life>6000 cycles (70% EOL)
Communication InterfaceCAN

Related product manuals