Do you have a question about the Sungrow SBR064 and is the answer not in the manual?
Battery Type | Lithium Iron Phosphate (LFP) |
---|---|
Nominal Voltage | 51.2 V |
Battery Module Energy | 6.4 kWh |
Operating Temperature | -10°C to 50°C |
Communication | CAN/RS485 |
Protection Level | IP65 |
Scalability | Up to 8 modules in parallel |
Cycle Life | 6000 cycles @ 80% DoD |
Trademarks associated with Sungrow and other mentioned trademarks.
Prohibitions regarding the use of Sungrow's software and firmware.
Specifies the battery models for which this manual is valid.
Identifies intended users and required skills for handling the battery.
Provides guidance on reading the manual and obtaining updates.
Explains the meaning of symbols used in the manual.
Crucial safety precautions and potential hazards during battery operation.
Guidelines for safely handling the battery to prevent damage.
Procedures for handling emergencies like leaking batteries or fires.
Overview of the high-voltage LFP battery system for residential use.
Identifies and illustrates the main parts of the battery system.
Details the function and location of electrical terminals.
Explains the meaning of various symbols found on the product.
Describes the SOC and status indicators and their meanings.
Procedures for safely unpacking and inspecting the product upon receipt.
Lists all items included in the product package.
Guidelines for proper storage conditions to maintain battery integrity.
Critical safety precautions to be followed during the mounting process.
Criteria for selecting an optimal and safe location for battery installation.
Specifies ideal environmental conditions for battery installation.
Recommended clearances around the battery for heat dissipation.
Lists the necessary tools for installing the battery.
Instructions for preparing the protective earth cable.
Steps for assembling the DC connectors for the battery system.
Detailed steps for assembling the communication connector.
Step-by-step guide for physically installing the battery modules.
Checks to perform before initiating the battery commissioning process.
Steps to follow for the initial startup and commissioning of the battery.
Guides for diagnosing and resolving common faults and error codes.
Recommended maintenance schedules and inspection procedures.
Detailed technical specifications and parameters for battery models.
Frequently Asked Questions and their answers regarding battery operation.
Information on warranty, service, and liability exclusions.
Details on how to contact Sungrow for support and inquiries.