EasyManua.ls Logo

Sungrow SG285HX - Page 31

Sungrow SG285HX
128 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
The AC cable is vertically led into the AC terminal, and the straight length is higher
than 200 mm.
In case of multiple inverters, reserve specific clearance between the inverters.
Back-to-Back Installation
When installing inverters back-to-back, the distance between every two inverters should be
at least 600 mm (recommended).
If the on-site distance is shorter than the recommended clearance, add a baffle between
every two inverters to form a heat dissipation channel (not recommended). The baffle plate
should be placed horizontally between two inverters and should not block the air inlet and
outlet of inverters.
User Manual 4 Mechanical Mounting

Table of Contents