EasyManua.ls Logo

Sunman Dragonfly - Page 20

Default Icon
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© 2024 SunMan (Zhenjiang) Company Limited. All rights reserved. Specifications included in this manual are subject to change
without notice.
www.sunman-energy.com
version SMH-2024B page18 / 29
TM
If there is no walkway between two rows of modules, installation personnel
must use construction bridge to fasten the prefabricated units.
Follow the steps above to install the other modules.

Related product manuals