1.1. Requirements to water tank
installation room
Whenchoosingaroomfortankinstallation
observethefollowingrequirements:
- to have a drainage channel. Some
maintenanceproceduresrequiredraining
of all water from the tank.
- Thermal insulation of the room. This
provides efficiency of the appliance and
preventsthewaterfromfreezing.
1.2.Requirementsforinstallaon.
•Thelengthofconnecngpipesbetween
thewatertankandconsumermustbeas
shortaspossible.
• Before connecng the boiler to the
installaon, check all screw connecons
(bolt inspecon cover ange, plug and
anode). In very rare cases - during
transportaon, loading and unloading
operaons-thescrewconneconsmay
beloosen.
• Before commissioning, check the
installaonforleaks.
•Donotexceedtheworkingpressureof
3bar.
•Ifthereisariskoffreezingofwaterin
thetank-drainthetankcompletelyorlet
thewaterheaterworksconnuously.
2. DESCRIPTION OF BUFFER TANK
Accumulatestheheatgeneratedbyboiler;
recommended for each space-heang
system. Ensures opmum operang
mode of biomass boiler, perming its
Dear Customers,
This manual contains important
informaon for the safe and correct
installaon, start-up and trouble-free
operaon and maintenance of buer
tank. Observing the instructions of this
Manualisintheinterestofthecustomer,
anditisoneoftheguaranteetermsand
conditions.
1. INSTRUCTION TO INSTALLER
The preparation, installation
and commissioning must be
performed by an authorized
installer / service.
During installation and operation, the
country specific requirements and
regulationsmustbe
observed:
• local construction regulations on
installation of water tank; weight of the
boilertocomplywith
the stability of the floor of the room
whereitwillbeinstalled.
• regulations and norms concerning
the fitting of the installation with safety
devices.
• safety during installation - personal
protectiveequipment
i
Use only original SUNSYSTEM
parts.

Other manuals for Sunsystem P Series

Related product manuals