USE
1、INSTALLATION
A.installation of main machine
a. Choose a fixed,horizontal and rigidity platform,ensuring its stability
and solidity
b. Put the machine on the platform as mentioned above
c. Open the outer casing and dismantle the screw,save the screw carefully.
d. Plug the power cord and turn on the switch
B. INSTALLION OF WATER TANK AND PIPE