SL11B & S1500 Manual 934-6644 - Page 9
OPERATING INSTRUCTIONS
1 Set GAS SELECTOR VALVE to gas being used. The conversion shall
be done by the owner or lessor of the equipment.
NOTE: When using Propane Gas the Selector Valve must be locked
in position.
2 Ensure the FIRING VALVE (valve nearest the burner) is in the “ON”
position.
3 Connect power - 115 volt supply.
4 Open gas supply.
5 Push START Button and hold. White light will come on immediately.
After 5 second purge, red light will come on. When red light comes on,
release START button. If red light fails to remain on repeat sequence.
6 Set thermostat to desired temperature. ( S1500 only )
7 To stop, turn gas off, then push STOP button.
The appliance area should be kept clear and free from combustible
materials, gasoline, and other flammable vapours and liquids.
Ensure that the flow of supply air and combustion gases is not obstructed.
The installation and operation of the heater shall comply with the code
requirements specified by the authorities having jurisdiction.
General criteria for the use of construction heaters may be found in the
applicable sections of the National Standard of Canada Propane Installa-
tion Code CAN/CGA-B149.2.
THE INSTALLATION AND MAINTENANCE OF THE
HEATER MUST BE ACCOMPLISHED
BY A QUALIFIED SERVICE PERSON.