Do you have a question about the Sutphen SL75 and is the answer not in the manual?
Rated capacities for various Sutphen aerial models.
Steps to prepare the cab for aerial operations.
Procedure for engaging the PTO.
Steps to engage the fire pump.
Steps for operating pump and tower together.
Details on the underslung outrigger design and operation.
Instructions for raising and lowering the tower.
Procedure for extending and retracting the tower.
Instructions for rotating the tower.
How to use the high-speed switch for tower operations.
Procedure for draining the waterway and nozzles.
Description of the optional breathing air system.
Steps to retract the tower.
Steps to rotate the tower for storage.
Procedure to lower the tower into the cradle.
Steps to remove wheel chocks.
Lubrication and service for stabilizers.
Lubrication points for main lift cylinders.
Lubrication for pivot shaft bearings.
Lubrication for the turntable bearing.
Lubrication and service for the rotation gear reducer.
Lubrication for drive gears.
Lubrication for extension/retraction cylinder.
Lubrication and service for sheaves and cables.
Lubrication and maintenance of slide blocks.
Lubrication and maintenance of waterway and seals.
Maintenance of the waterway nozzle.
Steps for adjusting extension system cables.
Maintenance of the aluminum tower structure.
Details on turntable attachments and bolts.
Methods for attaching support structure to truck frame.
| Type | Aerial Ladder |
|---|---|
| Ladder Length | 75 feet |
| Ladder Material | Aluminum |
| Operation | Hydraulic |
| Turntable Rotation | Continuous 360 degrees |