EasyManua.ls Logo

Takeuchi TB290 - Page 117

Takeuchi TB290
274 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-15
OPERATION
Operating the arm
OPERATING THE MACHINE
Arm in:
Tilt the left operating lever backward.
Arm out:
Tilt the left operating lever forward.
Operating the bucket
Bucket load:
Tilt the right operating lever to the left.
Bucket dump:
Tilt the right operating lever to the right.
Operating the boom swing
Boom swing left:
Step on the left side of the pedal.
Boom swing right:
Step on the right side of the pedal.
Operating the second boom
Second boom raise:
Step on the left side of the pedal.
Second boom lower:
Step on the right side of the pedal.
Operating the dozer blade
Dozer blade lower:
Tilt the lever forward.
Dozer blade raise:
Tilt the lever backward.

Table of Contents

Related product manuals