EasyManua.ls Logo

Technibel CAFP 124 R - Page 30

Technibel CAFP 124 R
111 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SPAFP
30
Fig. 3-41
Slide
Hinge
Air-intake grille
Pull out the
air-intake grille
pushing claws
of the hinges
Screw
Latch
Fig. 3-42
Slide toward
front side
Side panel
Fig. 3-43
Unit
Suspension bolt
(field supply)
Ceiling surface
Washer (supplied)
Double nut
(field supply)
Fixture
Fig. 3-44
Unit
Suspension bolt
(field supply)
Washer (supplied)
Washer (field supply)
Double nut
(field supply)
Fig. 3-45
Ceiling
surface
Approx.
25 mm
Suspension bolt
Washer
(supplied)
Nut
(field supply)
(5) Before suspending the indoor unit, remove the 2
or 3 screws on the latch of the air-intake grilles,
open the grilles, and remove them by pushing the
claws of the hinges as shown in Fig. 3-41. Then
remove both side panels sliding them along the
unit toward the front after removing the 2 attach-
ment screws. (Fig. 3-42)
(6) Carry out the preparation for suspending the
indoor unit. The suspension method varies
depending on whether there is a suspended ceil-
ing or not. (Figs. 3-43 and 3-44)
(7) Suspend the indoor unit as follows:
a) Mount 1 washer and 2 hexagonal nuts on each
suspension bolt as shown in Fig. 3-45.
04-393 DC INV Tech p a-44 12/15/04 3:04 PM Page 30

Table of Contents

Other manuals for Technibel CAFP 124 R

Related product manuals