EasyManua.ls Logo

TechnipFMC Smith Meter 210 - Diaphragm; Petroleum Jelly Application

TechnipFMC Smith Meter 210
26 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 16 • MN03010 ║ Issue/Rev. 0.4 (6/17)
Figure 18 – Diaphragm
Install a new diaphragm O-ring. Use caution while pulling the O-ring down the
threads of the stem.
Figure 19 – Diaphragm O-ring
Apply a light coating of petroleum jelly to the top diaphragm O-ring and the stem.
Figure 20 – Petroleum Jelly Application
Model 210 Valve (I / O / S) Manual Service and Maintenance

Related product manuals