Technoform NEO-ANGLE - Shower Wall Installation Steps; Install Side Panels; Install Corner Caddy; Adhesive Curing and Caulking

Technoform NEO-ANGLE
7 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
par
by
450.699.2424–1877.377.4494450.699.8484info@technoform.cawww.technoform.ca
TSSK38202003‐08
ÉTAPESÀSUIVRE–MURSDEDOUCHE|STEPSTOFOLLOW–SHOWERWALL
1. Placezunpanneaudecôtésurlereborddelabasededouche.Àl'aided'uncrayon,tracezuneligne
repèresurlemurautourdupanneau(Fig.5).Retirezlepanneau.
2. Suivezlesinstructionsdufabricantd'adhésifpourcollerlepanneauetprocédezdelamêmefaçonpour
le2epanneaudecôté(Fig.6+7).
3. Poseztemporairementl'étagèreencoin.Àl'aided'uncrayon,tracezunelignerepèredechaquecôté
(Fig.8).
4. Appliquez ensuite l'adhésif selon les recommandations du manufacturier de l'adhésif afin de coller
l'étagèreencoin(Fig.9).
5. Maintenezlespanneauxetl'étagèreencoinenplaceàl'aidederubanmasquependantquel'adhésif
sèche(Fig.10).
6. Veuillez suivre les recommandations du manufacturier de l'adhésif quant au temps de séchage
(habituellementunminimumde24heures)avantd’appliquerlescellanttoutletouretsurlesjoints(Fig.
11).Veuillezsuivrelesrecommandationsdumanufacturierduscellantquantautempsdeséchage.
1. Placeoneofthesidepanelsontherimoftheshowerbase.Traceareferencelineonthewallaroundthe
panelwithapencil(Fig.5).Removethepanel.
2. Followtheinstructionsoftheadhesivemanufacturerinordertoinstall(glue)thepanelandproceedthe
samewayforthesecondsidepanel(Fig.6+7).
3. Temporarilyplacethecornercaddy.Withthehelpofapencil,traceareferencelineonbothsides(Fig.
8).
4. Applytheadhesiveasperthemanufacturer'sinstructionsandthenpermanentlyinstallthecornercaddy
(Fig.9).
5. Maintainpanelsandcornercaddyinplacewithmaskingtapewhileadhesivedries(Fig.10).
6. Follow the cure time recommendations (usually a minimum of 24 hours) of the manufacturer of the
adhesive before applying caulk beads to all edges and joints (Fig. 11). Follow the cure time
recommendationsofthemanufacturerofthecaulk.
ENTRETIEN&NETTOYAGE|CARE&CLEANING
Nettoyezavecunsavon doux (savonàvaisselle).NEPASemployerde produitsdenettoyageabrasifsou
corrosifs. L'usage de ces produits pourrait endommager les composantes et annulerait la garantie.
L'utilisation de grattoir, brosse ou tout autre objet pouvant endommager la surface du produit est à
proscrire.L'applicationrégulièred'unecirepourautodequalitécontribueraàmaintenirlelustreduproduit
etenfaciliteral'entretient.
Cleanwithgentlesoap(dishwashingliquid).DONOTuseanyabrasiveorcorrosivecleaningproducts.Using
theseproductsmaydamagethecomponentsandvoidthewarranty.Theuseofgritting,scraper,brushesor
any other object which can damage the surface of the product is proscribed. A regular application of a
qualitywaxwillhelpmaintainthesurfacefinishandfacilitatethemaintenance.