EasyManua.ls Logo

TECO AFJH User Manual

TECO AFJH
47 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
TECO Instruction Manual
Squirrel Cage Induction Motors
Whilst Motors are installed awaiting commissioning they must be adequately
protected against the elements, all external components in particular the shaft
extension and external labyrinth seals at the drive end must be fully covered
to avoid water ingress entering the motor body whilst stationery.
Please ensure that both the non drive end and drive end antifriction bearings
are fully purged with sufficient grease at first start up/commissioning
with the recommended grade and quantity of grease.

Questions and Answers:

TECO AFJH Specifications

General IconGeneral
BrandTECO
ModelAFJH
CategoryEngine
LanguageEnglish

Summary

Installation and Commissioning Procedures

Installation Requirements

Standard site conditions, ventilation, and foundation requirements.

Motor Coupling and Alignment

Procedures and tolerances for coupling motors to driven equipment.

Electrical Connection Procedures

Procedures for connecting motors to the power supply, including earthing.

Motor Operating Instructions

Pre-Start Motor Examination

Pre-start checks including wiring, connections, earthing, and lubrication.

Motor Starting Procedures

Procedures for starting motors, including load, attempts, and troubleshooting.

Routine Motor Maintenance

Periodic Motor Maintenance

Regular Inspection and Maintenance

General guidelines for periodic inspection and maintenance procedures.

Motor Bearings Maintenance

Rolling Bearing Maintenance

Detailed guidance on maintaining sealed-for-life and greasable bearings.

Motor Troubleshooting Guide

Fault Finding and Recognition

Tables listing common faults, symptoms, causes, and remedies.

Related product manuals