Teco Installation and Maintenance Manual 
TEFC Squirrel Cage Induction Motors 
Teco Electric and Machinery Company 
Manual Number: IOM ~ TEFC Rev.01 
6.3.  VARNISH. 
   Kind of Varnish 
JIS-W-25 or W-28 are highly recommended. 
a.   Method of Varnish Treatment 
i.    Dipping method: Immerse windings completely into varnish until no 
air bubbles appear.             
 ii.  Pouring Method: Pour varnish completely over windings  
Note: Let varnish drip to dry after dipping or pouring. Changing position of 
the motor will obtain an even coverage. 
 b.  Curing of Varnish 
  i.  Set oven temperature at 110
o
C.  
  ii.  Curing time should be 12 – 16 hours 
  iii.  Ensure ventilation is adequate during curing. Combustible gases are 
                 present. 
To ensure adequate insulation the above procedure should be repeated. 
 
6.4.  KEY POINTS FOR MAINTENANCE & INITIAL OPERATION  
 INSPECTION AFTER LONG STORAGE. 
 
6.4.1. If the motor has been out of service in excess of three months, careful 
inspection should be made before putting the motor into operation again. 
 
6.4.2. When the motor is not in operation, the following precautionary measures 
should be undertaken: 
The place for storage should be dry and well-ventilated. If the motor has to 
be placed at work site for some time, it should be completely covered and 
stored on pallets to prevent dust and moisture contamination. 
Inspection and maintenance prior to storage. 
Please refer to “Regular Inspection and Maintenance” (Section 6.1).