EasyManuals Logo
Home>Tektronix>Test Equipment>DPO2012B

Tektronix DPO2012B Programmer's Manual

Tektronix DPO2012B
441 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #114 background imageLoading...
Page #114 background image
Commands Listed in Alphabetical Order
CALibrate:RE
Sults:FACtory? (Query Only)
Returns the status of internal and factory calibration, without performing any
calibration operations.
Group
Calibration a nd Diagnostic
Syntax
CALibrate:RESults:FACtory ?
CALibrate:RESults:SPC? (Query Only)
Returns the status of the SPC operation. This query does not initiate a SPC.
Group
Calibration a nd Diagnostic
Syntax
CALibrate:RESults:SPC?
Related Commands
*CAL?
Returns
INIT indicates that SPC has never suc cessfully completed.
PASS indicates that the last SPC operation passed.
FAIL indicates that the last SPC operation failed.
RUNNING indicates that the SPC operation is running.
Examples
CALIBRATE:RESULTS:SPC? returns the results of the last SPC operation: either
PASS or FAIL.
CALibrate:TEMPerature? (Query Only)
Returns 0 as the MSO/DPO2000/B series instruments do not support recording
of oscilloscope temperature.
Group
Calibration a nd Diagnostic
Syntax
CALibrate:TEMPerature?
2-98 MSO2000B, DPO2000B, MSO2000 and DPO2000 Series O scilloscopes Programmer Manual

Other manuals for Tektronix DPO2012B

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Tektronix DPO2012B and is the answer not in the manual?

Tektronix DPO2012B Specifications

General IconGeneral
BrandTektronix
ModelDPO2012B
CategoryTest Equipment
LanguageEnglish

Related product manuals