EasyManua.ls Logo

Terex ASV SR70 - Removal Procedure; Removal & Service Procedure

Terex ASV SR70
141 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10” & 15” Wheels (SR-70)
Note: The 15” idler and 10” bogie wheels may be
removed from the SR-70 and SR-80 undercarriages
without removing the tracks.
Removal
1. Perform steps 1-5 of the SR-80 15” idler wheel
removal procedure on page 13-1.
2. Remove the bolts securing the wheel to the hub.
(fig. 13-9)
3. Remove the wheel from the undercarriage.
(fig. 13-10)
Note: Steps 2 and 3 are accurate for the removal of
both the 10” and 15” wheels throughout the SR-70
undercarriages.
4. Repeat as necessary to remove the idler and
bogie wheels throughout the undercarriages.
Installation
1. To install the idler wheels on the SR-70, reverse
the removal procedure. Torque the 15” wheel
mounting bolts upon installation to 90 +/- 10
Lb. Ft. Torque the 10” wheel mounting bolts
upon installation to 37 +/- 5 Lb. Ft.
Bogie Wheel (SR-80 only)
Removal & Service Procedure
1. Perform steps 1-5 of the 15” idler wheel removal
procedure on page 13-1 to loosen the track and
provide clearance for bogie wheel removal.
13-3
Rubber Track Loader
13. Undercarriage
Required Tools
Socket/impact wrench
Heavy duty hydraulic jack
Combination wrench
ASV approved jack stands (2)
Shop vac or Pressure washer
13-9
13-10
Remove bolts
13-11
13-12
Required Tools
Combination/Socket Wrenches (including Allen)
Press & Various Press Tooling
Torque Wrench
Bench Vise
https://tractormanualz.com/

Table of Contents

Terex ASV SR70 - Removal Procedure; Removal & Service Procedure