©Copyright Task Force Tips LLC 2000-2020 LIM-025 June 23, 2010 Rev08
TASK FORCE TIPS LLC
MADE IN USA • tft.com
3701 Innovation Way, Valparaiso, IN 46383-9327 USA
800-348-2686 • 219-462-6161 • Fax 219-464-7155
10.0 OPERATION AND INSPECTION CHECKLIST
BEFORE EACH USE, the nozzle must be inspected to this checklist:
1. There is no obvious damage such as missing, broken or loose parts, damaged labels etc.
2. Waterway is clear of obstructions
3. Coupling is tight and leak free
4. Valve operates freely through full range and regulates ow
5. “OFF” position does fully shut o and ow is stopped
6. Nozzle ow is adequate as indicated by pump pressure and nozzle reaction
7. Shaper turns freely and adjusts pattern through full range
8. Nozzle smoothly moves into full ush and out of ush with normal ow and pressure restored
9. Shaper detent (if so equipped) operates smoothly and positively.
BEFORE BEING PLACED BACK IN SERVICE, nozzles must be inspected to this checklist:
1. All controls and adjustments are operational
2. Shut o valve (if so equipped) closes o the ow completely
3. There are no broken or missing parts
4. There is no damage to the nozzle that could impair safe operation (e.g. dents, cracks, corrosion or other defects)
5. The thread gasket is in good condition
6. The waterway is clear of obstructions
7. Nozzle is clean and markings are legible
8. Coupling is retightened properly
9. Shaper is set to desired pattern
10. Shuto handle is stored in the OFF position
NFPA 1962: Standard for the care, use, inspection, service testing, and replacement of re hose, couplings, nozzles and re hose appliances. Quincy,
MA: National Fire Protection Agency.
Equipment failing any part of the checklist is unsafe for use and must have the problem corrected
before use or being placed back into service. Operating equipment that has failed the checklist is
a misuse of this equipment.