12
Installing your thermostat
Switching on your system
It is important that all adhesives and grouting is dry
and fully cured before you switch on your underoor
heating.
Most adhesives take between 7 to 10 days to cure.
Follow manufacturer guidelines.
The temperature of your underoor heating should
be increased gradually to avoid thermal shock in
the oor. Start at 15°C and work up to your desired
temperature by 2-3°C per day.
Observe any maximum temperature guidelines from
your oor manufacturer.
Wait for
7 - 10 Days
before you
switch on
!