EasyManua.ls Logo

Toro 30609 - Operators Manual

Toro 30609
374 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Groundsmaster 4000--D/4010--DPage 7 -- 6Chassis
7. Install ball joint mount t o ball joint with slotted hex nut.
Torque nut from 90 to 100 ft--lb (123 to 135 N--m) while
aligning cotter pin holes. Install cotter pin.
8. Install center cutting deck (see Center Cutting Deck
Installation in Chapter 8 -- Cutting Decks).
9. If ball joint was removed from lift arm, torque ball joint
jam nut from 150 to 175 ft--lb (203 to 237 N--m).
10.Lubricate lift arm grease fittings.
11. After assembly is completed, raise and lower the cut-
ting deck to verify that hydraulic hoses and fittings do not
contact anything.
12.Check height--of--cut and deck pitch adjustment
(refer to Operator’s Manual).

Table of Contents

Other manuals for Toro 30609

Related product manuals