Turn o the power supply to the LTC Plus
satellite. Remove the cabinet’s front cover to
access the internal components. Disconnect
all cables labeled A through F from the timing
mechanism and the front distribution board.
Retain cables B, D, E and F for installation.
Cables A and C will no longer be required for
the conversion and should be sent back to Toro
for proper recycling or disposal procedures. See
Figure 1.
Open the cabinet’s top cover to access the
timing mechanism (TM). Remove the four
retaining screws from the TM and lift it out of
the cabinet. Remove the modem from the back
of the TM and retain it for installation. e
LTC Plus TM will no longer be required for the
conversion and should be sent back to Toro for
proper recycling or disposal procedures.
See Figure 2.
Disconnect the ex cables from the distribution
board on the front side of the cabinet. Detach
the output boards by removing the two retaining
screws. Retain all ex cables, screws and output
boards for installation. See Figure 3.
A
B
C
D
E
F
Figure 1 Figure 2 Figure 3
Disconnect the ex cable that connects the
distribution board to the pump/common
module on the front side of the cabinet. Detach
the pump/common module by removing the
three retaining screws and washers. Retain the
ex cable, screws, washers and pump/common
module for installation. See Figure 4.
Remove the three retaining screws from the
distribution board and detach it from the
backplate. Retain the screws for installation.
e LTC Plus distribution board will no longer
be required for the conversion and should
be sent back to Toro for proper recycling or
disposal procedures. See Figure 5.
NOTE
Only the front distribution board is
being replaced with a Network VP conversion
board. e rear distribution board (If
equipped) will communicate directly to the
Network VP conversion board.
Install the Network VP/VPE conversion board
onto the backplate. Use the three retaining
screws removed from the old distribution board
to secure. See Figure 6.
Figure 4 Figure 5 Figure 6
Network LTC Plus-to-Network VP/VPE
Conversion Kit Installation Instructions
Question and Answer IconNeed help?

Do you have a question about the Toro Network LTC Plus-to-Network VP and is the answer not in the manual?

Toro Network LTC Plus-to-Network VP Specifications

General IconGeneral
BrandToro
ModelNetwork LTC Plus-to-Network VP
CategoryIndustrial Electrical
LanguageEnglish

Summary

Initial Disassembly and Component Removal

Power Off and Cabinet Access

Turn off power, remove cabinet cover, and disconnect cables labeled A through F.

Timing Mechanism and Modem Removal

Remove the timing mechanism and its modem from the cabinet for conversion.

Distribution Board and Output Board Detachment

Disconnect flex cables from the distribution board and detach output boards.

Pump;Common Module Removal

Detach the pump/common module by removing retaining screws and washers.

Distribution Board Replacement

Remove the old distribution board and install the new Network VP/VPE conversion board.

Modem Identification and Installation

Identifying Your Modem Type

Determine modem type by sticker or presence of a serial port.

Installing 89-7519 Modem

Install the modem tray and slide the 89-7519 modem onto it, connecting the ribbon cable.

Installing 102-0104;102-8568 Modems

Install 102-0104/102-8568 modems onto the protective cover and connect ribbon cable.

Final Installation and Recycling

Connecting Network VP;VPE TM and Cables

Install the Network VP/VPE TM onto the satellite cabinet and connect all cable assemblies.

Recycling and Disposal Instructions

Instructions for sending old components to Toro for recycling or proper disposal.