2.InstallingtheRecoilStarter
Handle
Procedure
Installtherecoilstarterhandleintheropeguideas
showninFigure4.
Figure4
1.Ropeguide
3.InstallingtheDischarge
ChuteAssembly
1Dischargechuteassembly
2
Screws
2Washers
2Locknuts
1Knob
Procedure
Installthedischargechuteassemblyasshownin
Figure5.
Figure5
1.Knob
2.Bolt(2),washer(2),and
locknut(2)
Note:Installtheboltsfromtheinsideofdischarge
chuteassemblysothatthewashersandlocknutsareon
theoutsideofthechute.
Important:Donotovertightenthelocknuts.
4.FillingtheEnginewithOil
1
Bottleofengineoil
Procedure
Yoursnowthrowerdoesnotcomewithoilintheengine,
butitdoescomewithabottleofoil.
Important:Beforestartingtheengine,llthe
enginewithoil.Donotoverll.
Maxll:12oz.(0.35l),type:automotivedetergentoil
withanAPIserviceclassicationofSJ,SL,orhigher.
UseFigure6toselectthebestoilviscosityforthe
outdoortemperaturerangeexpected:
Figure6
Note:0W30syntheticoilisacceptableforuseincold
temperatures.
1.Movethesnowthrowertoalevelsurface.
2.Cleanaroundtheoilllcap(Figure13).
3.Unscrewtheoilllcapandremoveit.
4.Slowlypouroilintotheoilllhole,andfrequently
checktheoillevelonthedipstickbywipingthe
dipstickcleanandtheninserting,butnotscrewing
in,theoilllcapintothehole.
Note:Todeterminetheproperoillevelonthe
dipstick,refertoFigure7.
6