EasyManua.ls Logo

Toshiba e-STUDIO 163 - Page 181

Toshiba e-STUDIO 163
218 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
December 2005 © TOSHIBA TEC e-STUDIO163/203 TROUBLESHOOTING
5 - 25
5
7) Blank copy
Fig. 5-7
Defective area Step Check items Prescription
Transfer charger wire 1 Is the transfer charger wire cut off? Replace the transfer charger wire.
High-voltage transformer
(Transfer charger, Devel-
oper bias)
2 Is the high-voltage transformer out-
put defective?
Adjust the output, or replace the
transformer.
3 Are the connectors of the high-volt-
age harness securely connected? Is
the harness open circuited?
Reconnect the harness securely.
Replace the high-voltage harness.
Developer unit 4 Is the developer unit installed prop-
erly?
Check and correct the engaging con-
dition of the developer unit gears.
5 Do the developer sleeve and mixers
rotate?
Check and fix the drive system of the
developer unit.
6 Is the developer material smoothly
transported?
Remove the foreign matter from the
developer material.
7 Has the magnetic brush phase been
shifted?
Adjust the developer polarity.
8 Is the doctor blade positioned prop-
erly?
Adjust it using the doctor-sleeve jig.
Drum 9 Is the drum rotating? Check the drive system of the drum.
MAIN, LDR, SNS boards,
CIS unit and harnesses
10 Are the connectors securely con-
nected?
Check if the harnesses connecting
the boards are open circuited.
Connect the connectors securely.
Replace the harness.
Feeding direction

Other manuals for Toshiba e-STUDIO 163

Related product manuals