171
15. Floor drying
• This function is available only for the header remote controller.
• This function is used for drying concrete etc.
• Service personnel must operate the unit after setting the related DN code.
• Operation is not started unless All the related DN codes are set.
• Refer to the following for the settings of the related items. Please setup on the responsibility for an installer. An
unsuitable setup may cause a crack of concrete etc.
• When the operation starts, the unit operates as follows.
1 Press the [ ] button and the [ ] button at same time for 4
seconds or longer on the top screen to display the “FIELD SETTING
MENU”.
2 Press the [ ] / [ ] button to select "Floor drying" on the
FIELD SETTING MENU, then press the [ ] button for 4 seconds or
longer.
DN_14 setting start and End temperature [20-55°C]
DN_15 setting Max temperature [20-55°C]
DN_16 continuation days for every step up to Max temperature [1-7 days]
DN_17 temperature difference for every step up to Max temperature [1-10 K]
DN_18 continuation days for every step down to End temperature [1-7 days]
DN_19 temperature difference for every step down to End temperature [1-10 K]
DN_1A Continuation days in Max temperature [1-50 days]
3 Press the [ ] / [ ] button to select DN or Data, then press the
[ ] / [ ] button to set the value.
4 Press the [ ] button. The set value is registered.
Test mode
FIELD SETTING MENU(1/2)
Floor drying
Forced defrosting
Information input
Alarm history
SET
DN_14
DN_15
DN_16
°C
50
49
48
47
46
45
44
43
42
41
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
:
:
1
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Day
DN_17
DN_1A
DN_19
DN_18
lapsed days
setting temperature
total days
Floor drying
(DN) Data
FIX
Code