EasyManua.ls Logo

TrailFX Tonneau - Clamp Engagement and Final Tightening; Drain Tube Installation

TrailFX Tonneau
7 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.TrailFX.com
12 13
14
12 & 13. Once in the open position double check the clamp engagement to the side rail and tighten. Test the
cover again for proper operation, adjust as needed, then tighten the star knobs.
14. Attach the drain tubes to the ttings at the front of the bed rail and position the tubes to divert water out
of the truck bed. This can be done by placing the tube behind a bed liner, through an existing hole in the bed,
or by drilling a 5/8” hole in the bulkhead.
Note: If you choose to place the tube behind your bedliner, be sure your drain holes in the bed are not clogged.
Note: If you choose to drill holes, be sure to clean up the metal shavings.
Page 5 of 7

Related product manuals