SSAAFFEETTYY WWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
February 2022
1188--BBBB4411DD11--11AA--EENN
Single Packaged Heat Pump
13.4 SEER2 Convertible, 2 5 Ton
4WCC4024E1000A
4WCC4030E1000A
4WCC4036E1000A
4WCC4042E1000A
4WCC4048E1000A
4WCC4060E1000A
NNoottee:: “Graphics in this document are for representation
only. Actual model may differ in appearance.”
NNoottee:: “Unit specific Service Facts available online.”
Installation and Operations Manual
Question and Answer IconNeed help?

Do you have a question about the Trane 4WCC4060E1000A and is the answer not in the manual?

Trane 4WCC4060E1000A Specifications

General IconGeneral
BrandTrane
Model4WCC4060E1000A
CategoryHeat Pump
LanguageEnglish

Summary

SAFETY SECTION

Electrical Safety Warnings

Warnings on electrical hazards, shock, and proper grounding procedures.

Refrigerant and Operational Hazards

Hazards related to R-410A refrigerant and operating without panels.

Chemical Exposure Warning

Notification regarding exposure to chemicals like lead.

Introduction, Unit Inspection, and Specification

Charging Procedures

Charging Above 55°F OD Ambient

Method for charging the system in cooling mode above 55°F.

Charging Below 55°F OD Ambient

Recommended method for charging in heating mode below 55°F.

Determine Unit Clearances

Location and Recommendation Information

Unit Installation

Lifting and Rigging

Unit Lifting and Rigging Procedures

Safe practices and warnings for lifting and rigging the unit.

Rooftop Installation Methods

Ductwork Installation

Electrical Wiring and Connections

Electrical Connection Standards

Requirements for wiring and grounding per codes.

Power Supply and Disconnects

Guidelines for electrical power, disconnect switches, and overcurrent protection.

Unit Startup Procedures

Pre-Start Checklist

A checklist of items to verify before starting the unit.

Starting in Cooling and Heating Modes

Procedures to start the unit in cooling and heating operations.

Sequence of Operation

Maintenance and Service

Defrost Control and Faults

Troubleshooting Chart