Trane Axiom GEVB 60 User Manual

Trane Axiom GEVB 60
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
15 - 25 Ton
1/2 - 5 Ton
6 - 15 Ton
6 - 10 Ton
Installation,
Operation and
Maintenance
March 2007 WSHP-SVX01E-EN
GEHB GEVB: Design Sequence
006 - 060 – 50/60 HZ 006 - 060 – 50/60 Hz "R" and later
072 - 180 – 50/60 Hz 072 - 300 – 50/60 Hz "D" and later
Axiom™
Horizontal/Vertical
Water-Source Comfort System
Models GEH and GEV

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Trane Axiom GEVB 60 and is the answer not in the manual?

Trane Axiom GEVB 60 Specifications

General IconGeneral
BrandTrane
ModelAxiom GEVB 60
CategoryWater System
LanguageEnglish

Summary

Preface and Warnings and Cautions

Overview of Manual

Describes the manual's purpose, scope, and recommended usage for safe operation.

Hazard Identification

Explains warning symbols (WARNING, CAUTION) and their significance for safety.

GEH Clearance Dimensions

GEH Service Clearances

Details required service clearances for GEH units, including specific configurations.

GEV Clearance Dimensions

GEV 1/2 through 5 Ton Clearance Dimensions

Specifies required service clearances for GEV units in the 1/2 to 5 ton range.

GEV 6 through 10 Ton Clearance Dimensions

Details minimum service clearances for GEV units from 6 to 10 tons.

GEV 12 1/2 through 25 Ton Clearance Dimensions

Outlines minimum service clearances for GEV units from 12.5 to 25 tons.

Installation - General Checks and Electrical

General Installation Checks

Provides a checklist of essential steps before and during unit installation.

Main Electrical

Covers power supply verification, panel inspection, and main power wiring connections.

Unit Mounting and Plumbing

Hanging the Horizontal Unit

Provides instructions and warnings for safely lifting and hanging horizontal units.

Water Loop Cleaning and Flushing

Cleaning and Flushing the Water Loop

Explains the process of flushing the water loop to remove debris and ensure system cleanliness.

Valve and Wiring Installation

Field Installed Power Wiring

Requirements for power wiring, conforming to electrical codes and using copper conductors.

Main Unit Power Wiring

Guidance on grounding and connecting high voltage power to the unit.

24 VAC Control Wiring

Economizer Start-Up Sequence

Initial Unit Start-up

Step-by-step guide for initial unit start-up procedures, including thermostat settings.

Electrical Requirements

Operation Pressures

Operating Pressures in Cooling/Heating

Charts showing approximate refrigerant pressures based on operating conditions.

Preventive Maintenance

Troubleshooting

Warranty Information