EasyManua.ls Logo

Trane Axiom GEVB 040 User Manual

Trane Axiom GEVB 040
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
15 - 25 Ton
1/2 - 5 Ton
6 - 15 Ton
6 - 10 Ton
Installation,
Operation and
Maintenance
March 2007 WSHP-SVX01E-EN
GEHB GEVB: Design Sequence
006 - 060 – 50/60 HZ 006 - 060 – 50/60 Hz "R" and later
072 - 180 – 50/60 Hz 072 - 300 – 50/60 Hz "D" and later
Axiom™
Horizontal/Vertical
Water-Source Comfort System
Models GEH and GEV

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Trane Axiom GEVB 040 and is the answer not in the manual?

Trane Axiom GEVB 040 Specifications

General IconGeneral
ModelGEVB040
CategoryWater System
RefrigerantR-410A
Cooling Capacity40, 000 BTU/h
Heating Capacity40, 000 BTU/h

Summary

Overview of Manual

Hazard Identification

Identifies potential hazards leading to death or serious injury.

Preface and Warnings and Cautions

General warnings and cautions applicable to the manual and product.

General Information

Jobsite Inspection

Procedures for inspecting the unit upon delivery to check for shipping damage.

Weights

Weight Distribution for Hanging the GEH Model

Provides diagrams and approximate weight distribution for hanging GEH units.

Dimensions

GEH Clearance Dimensions

Specifies required clearances for service access on GEH units.

GEV 1/2 through 5 Ton Clearance Dimensions

Details clearance requirements for GEV 1/2 to 5 ton units.

GEV 6 through 10 Ton Clearance Dimensions

Specifies clearance requirements for GEV 6 to 10 ton units.

GEV 12 1/2 through 25 Ton Clearance Dimensions

Outlines minimum service clearances for GEV 12.5 to 25 ton units.

Installation

General Installation Checks

A checklist summarizing essential steps for successful commercial unit installation.

Main Electrical

Covers verification of power supply and connections for main electrical systems.

Low Voltage Wiring (AC & DC) Requirements

Specifies requirements for control wiring between thermostat and unit.

Filter Installation

Instructions for installing filters, including rack and hardware details.

Field Installed Power Wiring

Emphasizes conforming power wiring to NEC and using copper conductors.

Main Unit Power Wiring

Covers installing a disconnect switch and making high voltage connections.

Waterside Economizer Installation

Waterside Economizer Installation for GEV and GEH 6 to 25 Ton Models

Economizer Start-Up

Pre-Start

Pre-Start Checklist

Essential checks to perform before energizing the unit for the first time.

Sequence of Operation

Operation Pressures

Maintenance

Wiring

Troubleshooting

Related product manuals