EasyManua.ls Logo

Trane Axiom GEHB 030 User Manual

Trane Axiom GEHB 030
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
15 - 25 Ton
1/2 - 5 Ton
6 - 15 Ton
6 - 10 Ton
Installation,
Operation and
Maintenance
March 2007 WSHP-SVX01E-EN
GEHB GEVB: Design Sequence
006 - 060 – 50/60 HZ 006 - 060 – 50/60 Hz "R" and later
072 - 180 – 50/60 Hz 072 - 300 – 50/60 Hz "D" and later
Axiom™
Horizontal/Vertical
Water-Source Comfort System
Models GEH and GEV

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Trane Axiom GEHB 030 and is the answer not in the manual?

Trane Axiom GEHB 030 Specifications

General IconGeneral
BrandTrane
ModelAxiom GEHB 030
CategoryWater System
LanguageEnglish

Summary

Dimensions

GEH Clearance Dimensions

Details minimum service clearances required for GEH units for proper access and maintenance.

Installation

General Installation Checks

Provides a checklist of essential steps for successfully installing commercial units.

Main Electrical

Covers verification of power supply compliance and connection to the unit's main power terminal block.

Waterside Economizer Installation

Provides step-by-step instructions for installing the waterside economizer package on heat pump units.

Economizer Start-Up

Start-up Sequence

Guides through the procedure for starting up the unit with the waterside economizer system.

Electrical Requirements

Pre-Start

Pre-Start Checklist

A checklist of essential system devices and conditions to verify before energizing the unit.

Sequence of Operation

Initial Unit Start-up

Details the step-by-step procedure for starting up the unit for the first time.

Preventive Maintenance