Page 7
INSTALLER'S GUIDE
STEP 5 - Connect high voltage wiring
1. Connect L1, L2, and Ground to the lugs on the terminal
block on the heater as illustrated.
Note: Minimum terminal screw torque is 35 in-lbs.
Ground
L1
L2
BLACKRED
GREEN
High Voltage
Terminal Block
Ground
Lug
STEP 6 - Connect the mating low voltage
harnesses on the heater and the air handler
cabinet.
Low voltage harness plug
Low voltage
harness plug