Periodic Maintenance
Contractor Confi rmation Check Sheet
This check sheet must be completed by the installing contractor and submitted prior to requesting Trane Service
start-up support. The check sheet identifi es a list of items that need to be completed prior to actual machine start-up.
Contractor Con rmation Check Sheet
Addressed to the Trane Service of ce of:
Job Name: Job location:
Model No.: Sales order No.:
Unit Cooling water
Unit installed Connected to the unit
Isolator pads in place Connected to the cooling device
Chilled Water
Connected to the pumps
Connected to the unit System ushed and then lled
Connected to the air handling units Pumps run and air bled
Connected to the pumps Strainers cleaned
System ushed and then lled Flow switch installed and checked/set
Pumps run and air bled Throttling cock installed in leaving water
Strainers cleaned Thermometers installed in leaving/entering water
Flow switch installed and checked/set Gauges installed in leaving/entering water
Throttling cock installed in leaving water Cooling water control operational
Thermometers installed in leaving/entering water Water treatment equipment
Gauges installed in leaving/entering water
Wiring
Power supply connected and available
External interlock connected
Load
System can be operated under load condition
We will therefore require your service technician on job by*_____________________.
Checklist completed by____________________________________________________.
Date____________________________________________________________________.
* Return this completed checklist to your Trane Service offi ce as soon as possible to enable the start-up visit to
be scheduled. Be aware that advance notifi cation is required to allow scheduling of the start-up as close to the
requested date as possible. Additional time required to complete the start-up and adjustment due to incompleteness
of the installation will be invoiced at prevailing rates.