EasyManua.ls Logo

Trane ComfortLink II 4TWL9060A1000B User Manual

Trane ComfortLink II 4TWL9060A1000B
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SSAAFFEETTYY WWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
October 2021
1188--BBCC110000DD11--11DD--EENN
Variable Speed ComfortLink II
Side Discharge HP Models
For coastal applications where units are installed within one (1) mile of salt water, epoxy coated models are recommended. These models
have an 8 week lead time after order.
EEppooxxyy CCooaatteedd MMooddeell
4TWL9024A1000B
4TWL9036A1000B
4TWL9048A1000B
4TWL9060A1000B
4TWL9024A1COTB
4TWL9036A1COTB
4TWL9048A1COTB
4TWL9060A1COTB
NNoottee:: “Graphics in this document are for representation
only. Actual model may differ in appearance.”
Installer’s Guide
Question and Answer IconNeed help?

Do you have a question about the Trane ComfortLink II 4TWL9060A1000B and is the answer not in the manual?

Trane ComfortLink II 4TWL9060A1000B Specifications

General IconGeneral
BrandTrane
ModelComfortLink II 4TWL9060A1000B
CategoryAir Conditioner
LanguageEnglish

Summary

Safety Section

Hazardous Voltage and Electrical Safety

Warnings about hazardous voltage, electrical hazards, and grounding requirements.

Refrigerant and Material Handling Precautions

Guidelines for handling refrigerants, oils, and specific material warnings.

Refrigerant Line Brazing

Brazing Procedure Steps

Step-by-step instructions for brazing refrigerant lines, including preparation and purging.

Refrigerant Line Leak Check

Leak Detection and Evacuation

Procedures for checking refrigerant lines for leaks and performing system evacuation.

Electrical – High Voltage

Start Up Procedures

System Charge Adjustment

Temperature Measurements and Corrections

Procedures for measuring temperatures and applying subcooling corrections for system charge.

Charging and Correction Charts

Charging the Unit

Subcooling Charging Below 55° F

Checkout Procedures

Final Installation Checklist

A comprehensive list of checks to ensure proper installation and system readiness.

Related product manuals