EasyManua.ls Logo

Trane CXA Series - Panel Removal and Drain Pipe Positioning; Unit and Tank Alignment

Trane CXA Series
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Tank mounting instructions
A. Remove the two inspection panels of the water group with tank.
B. With the unit in lifting phase positioning the drain path pipes as shown in figure below.
C Position the unit in the group with water tank, lining up the holes of the upper bracket of the tank with the drilling of the
underside of the foot, making sure to route the drain path pipes inside the holes on the base of the hydronic kit.

Related product manuals