OAU-SVX01H-EN 35
System Configuration and Pre-Start
The following procedure must be completed prior to
performing the startup procedure in “Startup,” p. 38. This
section describes procedures to navigate the various
displays on the Unit Display and configure the Outdoor Air
Unit Main Unit Display system setpoints and operating
parameters.
Important: This section is intended to provide
guidelines for navigation through the
remote operator display screens. For
additional control system information, refer
to Integration Guide: Tracer™ UC600
Programmable Controller for Packaged
Outdoor Air Unit (BAS-SVP18*-EN).