OAU-SVX006E-EN 39
Pre-Start Check List
Task Initial Date
1. Voltage is present and landed at equipment.
2. Gas piping is complete and land
ed at each component. Inlet gas pressure
to be between 7 in. wc and 14 in. wc.
3. Field installed sensors installed. Refer to “Factory-Provided Sensors,” p. 38
for l
i
st of sensors that may be required.
4. Control wiring installed and landed.
5. Accessories installed.
6. Ductwork installed (all runs in place, final
tie in complete).
7. Drain lines installed and properly terminated.
8. Startup appointment w
i
th Horizon certified Trane service technician set and
confirmed.
9. Test and Balance recommended prior to Start Up.
Notes:
• Check list
must be
completed and returned to Trane before startup is scheduled.
• Startup must be performed by a Horizon-certified
Trane technician with Tracer™ TU program.
• Contractor to furnish access to equipment (ladder, lift, or roof access).