Highlights safety requirements for field wiring, grounding, and PPE.
Critical safety alert regarding electrical hazards before performing any work.
Provides detailed dimensions for various unit sizes and configurations.
Specifies required clearances for unit installation and roof openings.
Details unit weights, corner weights, and center of gravity dimensions.
Guidelines for safely lifting and rigging the unit.
Covers critical safety aspects like lifting, roof damage, and structural integrity.
Procedures for connecting ductwork and installing roof curbs.
Guidelines for rigging and setting the unit onto the curb.
Guidelines for main power, electric heat, and low voltage wiring.
Guidelines for field-installing power wiring and grounding.
Safety precautions for handling high voltage, capacitors, and rotating components.
Procedure for checking voltage imbalance and ensuring correct electrical phasing.
Step-by-step procedures for compressor start-up and hot gas reheat testing.
Final checks to perform after unit startup and testing.
General safety for maintenance and routine monthly checks.
Covers coil cleaning, chemical safety, hail guards, and MCHE coil care.