EasyManua.ls Logo

Trane Precedent THJ210 - User Manual

Trane Precedent THJ210
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
SAFETY WARNING
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning equipment
can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person could result in death or
serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that are attached to the equipment.
December 2022
RT-SVX074A-EN
Installation, Operation, and Maintenance
Packaged Rooftop Air
Conditioners
Precedent™ Cooling and Electric
Heat
High Efficiency
6 to 25 Tons 60 Hz
Model Numbers: THJ072A - THJ300A
Question and Answer IconNeed help?

Do you have a question about the Trane Precedent THJ210 and is the answer not in the manual?

Trane Precedent THJ210 Specifications

General IconGeneral
BrandTrane
ModelPrecedent THJ210
CategoryAir Conditioner
LanguageEnglish

Summary

Introduction

Proper Field Wiring and Grounding

Emphasizes the need for qualified personnel and adherence to electrical codes.

Personal Protective Equipment (PPE)

Details required PPE for safe operation and handling of hazards.

Model Number Description

Model Number Digits Overview

Explains the meaning of each digit in the unit model number for identification.

Pre-Installation

Hazardous Voltage Safety

Warns about electrical hazards and outlines steps for safe servicing of electric heat elements.

Dimensions and Weights

Installation Clearances and Weights

Specifies minimum operating and service clearances and provides weight data.

Lifting and Rigging

Heavy Object and Unit Lift Safety

Details safety warnings and precautions for lifting heavy equipment.

Rigging and Center of Gravity

Illustrates rigging points and center of gravity for lifting units.

Installation

General Installation Safety and Requirements

Covers warnings for heavy objects, roof damage, and general installation checks.

Rigging and Unit Placement

Details rigging procedures, fork pocket usage, and unit placement on the curb.

Electrical and Power Wiring

Details power requirements, electric heat, field wiring, and main power connections.

Low Voltage and DC Control Wiring

Guides low voltage, DC analog, and main panel wiring for controls.

Pre-Start

Pre-Start Safety Precautions

Highlights safety warnings for hazardous voltage, capacitors, and rotating components.

Voltage Imbalance Testing

Details how to measure and calculate voltage imbalance for three-phase power.

Electrical Phasing Verification

Explains how to verify proper electrical phasing for three-phase motors.

Unit Start-Up

Compressor Start-Up Procedures

Details steps for safely starting compressors, including gauge connections and pressure checks.

Final System Setup Checks

Outlines final checks for system setup, programming, and securing panels.

Unit Start-Up Safety Alert

Provides a critical safety alert emphasizing adherence to manual instructions and bulletins.

Maintenance

General Maintenance Safety

Outlines safety precautions for performing maintenance procedures.

Coil Cleaning Procedures

Details methods for cleaning coils, including safety for chemicals and specific MCHE coil care.

Troubleshooting

Wiring Diagrams

Main Unit Wiring Diagrams

Lists schematics for main unit power, dual/single compressor, and fan configurations.

Piping Diagrams

Related product manuals