EasyManua.ls Logo

Trane Precedent YZC120F User Manual

Trane Precedent YZC120F
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Packaged Rooftop Air Conditioners
Precedent™ with eFlex™
Technology, Gas/Electric
3 to 10 Tons - 60 Hz
Installation, Operation, and Maintenance
January 2021
RT-SVX46G-EN
Model Numbers:
YZC036E YZC072F
Model Numbers:
YZC048F YZC090F
Model Numbers:
YZC060E YZC102F
Model Numbers:
YZC120F
SAFETY WARNING
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of
heating, ventilating, and air-conditioning equipment can be hazardous and requires specific knowledge and training.
Improperly installed, adjusted or altered equipment by an unqualified person could result in death or serious injury.
When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that are
attached to the equipment.

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Trane Precedent YZC120F and is the answer not in the manual?

Trane Precedent YZC120F Specifications

General IconGeneral
ModelYZC120F
CategoryAir Conditioner
Cooling Capacity10 tons
RefrigerantR-410A
Compressor TypeScroll
Phase3
Voltage208-230V

Summary

Introduction

Proper Field Wiring and Grounding

Emphasizes qualified personnel for field wiring and grounding.

Personal Protective Equipment PPE

Details essential PPE for safe operation and maintenance.

Follow EHS Policies

Mandates adherence to company EHS policies for safety.

Model Number Description

General Information

Unit Inspection

Outlines procedures for inspecting the unit upon arrival.

Compressor Inverter Protection

Explains protection mechanisms for the compressor and inverter.

Condensate Drain Pan Overflow Switch Optional ReliaTel

Describes the condensate overflow switch and its safety function.

Smoke Detector Sensor Optional

Details the optional smoke detector sensor.

Pre-Installation

Fiberglass Wool

Warns about hazards associated with fiberglass wool exposure.

Precautionary Measures

Lists precautions for handling fiberglass wool.

First Aid Measures

Provides first aid guidance for eye and skin contact.

Dimensions and Weights

Unit Clearances

Illustrates minimum clearances for installation and service.

Heavy Objects

Warns about hazards of lifting heavy objects.

Improper Unit Lift

Warns about hazards of improper lifting techniques.

Installation

Foundation

Describes foundation requirements for horizontal installations.

Horizontal Units

Describes foundation requirements for horizontal installations.

Risk of Roof Collapsing

Warns about roof collapse hazards during rooftop installation.

Ductwork

Provides recommendations for supply and return air ductwork installation.

Roof Curb

Details roof curb requirements for downflow installations.

Downflow

Details roof curb requirements for downflow installations.

Combustible Materials

Warns about fire hazards from combustible materials near heat sources.

Rigging

Provides recommendations for unit rigging and lifting.

Heavy Objects

Warns about hazards when lifting heavy objects.

Improper Unit Lift

Warns about hazards of improper unit lifting.

General Unit Requirements

Provides a checklist for successful commercial unit installation.

Horizontal Discharge Conversion 3 to 5 Ton Units

Outlines conversion steps for horizontal discharge on 3-5 ton units.

TCO 1 Instructions for Low NOx Gas Furnace Option

Explains TCO 1 instructions for the low NOx gas furnace.

TCO 1 Instructions

Provides step by step instructions for replacing TCO1.

Horizontal Discharge Conversion 6 to 10 Ton Units

Outlines conversion steps for horizontal discharge on 6-10 ton units.

Air Fi Wireless Communication Interface

Details conversion for Air Fi interface to horizontal discharge.

Main Electrical Power Requirements

Details main electrical power connection requirements.

Through the Base Gas Installation

Provides instructions for through the base gas line installation.

Requirements for Gas Heat

Lists requirements for gas heat installation and piping.

Ultra Low NOx Gas Furnace Option Component Layout

Shows the component layout for the Ultra Low NOx Gas Furnace.

Condensate Drain Configuration

Provides instructions for configuring condensate drainage.

Drain Pan Removal Units with Condensate Overflow Switch Option

Details drain pan removal for units with overflow switch.

Filter Installation

Provides instructions for filter installation and replacement.

Field Installed Power Wiring

Details field installed power wiring requirements.

Main Unit Power

Details main unit power connection requirements.

Standard Wiring

Details standard unit power wiring connections.

Optional TBUE Wiring Through the Base Electrical Option

Explains through the base electrical wiring.

Field-Installed Control Wiring

Details field installed control wiring requirements.

Proper Field Wiring and Grounding Required

Emphasizes correct field wiring and grounding for controls.

Pre-Start

Hazardous Voltage w Capacitors

Warns about capacitor hazards before starting.

Voltage Imbalance

Explains voltage imbalance requirements and calculations.

Electrical Phasing Three Phase Motors

Details how to check and correct electrical phasing.

Unit Startup

Verifying Proper Air Flow

Outlines steps to verify correct air flow.

Return Air Smoke Detector

Describes the function of the return air smoke detector.

Compressor Startup

Details procedures for compressor startup.

Final System Setup

Outlines final checks after startup procedures.

Close the main disconnect switch or circuit protector switch

Final step to restore power to the unit.

Maintenance

Rotating Components

Warns about hazards of rotating components during maintenance.

Filters

Instructions for checking and replacing air filters.

Coil Cleaning

Provides instructions for cleaning evaporator and condenser coils.

Coil Damage

Warns about potential coil damage during cleaning.

Hazardous Chemicals

Warns about hazards of chemicals used for coil cleaning.

Troubleshooting

Hazardous Service Procedures

Warns about hazards during troubleshooting.

Live Electrical Components

Warns about live electrical components during troubleshooting.

System Status Checkout Procedure

Outlines procedures for checking system status.

System failure

Describes how to diagnose system failures.

Simultaneous Heat and Cool Failure

Describes simultaneous heat and cool failure conditions.

System Failure

Details voltage readings for system failure diagnosis.

Heat Failure

Details voltage readings for heat failure diagnosis.

Cool Failure

Details voltage readings for cool failure diagnosis.

Service Failure

Details voltage readings for service failure diagnosis.

Hazardous Voltage

Warns about hazardous voltage when operating without a sensor.

Table 12 Fault detection and diagnostic codes

Lists fault detection and diagnostic codes.

Unit Economizer Control ECA Troubleshooting

Troubleshooting the Economizer Actuator using LED indicators.

ReliaTel Control

Troubleshooting the Economizer Actuator using LED indicators.

Heating Failure

Details causes and indicators of heating failures.

Cooling Failure

Details causes and indicators of cooling failures.

Resetting Cooling and Ignition Lockouts

Explains how to reset cooling and ignition lockouts.

Unit Wiring Diagrams Numbers

Related product manuals