EasyManua.ls Logo

Trane *UH1B060A9361A User Manual

Trane *UH1B060A9361A
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Upflow/ Horizontal, Downflow/ Horizontal,
Gas-Fired, Direct Vent Condensing
Furnaces
ALL phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES
IMPORTANT This Document is customer property and is to remain with this unit.
Please return to service information pack upon completion of work.
Installer’s Guide
*__First letter may be “A” or “T”
18- CD29D1- 3
UPFLOW
*UH1
UPFLOW/HORIZONTAL
A341624P13
*UH1
*UH1B040A9241A
*UH1B060A9361A
*UH1B080A9421A
*UH1C080A9601A
*UH1C100A9481A
*UH1D100A9601A
*UH1D120A9601A
*DH1B040A9241A
*DH1B065A9421A
*DH1C085A9481A
*DH1D110A9601A
*DH1
DOWNFLOW
DOWNFLOW/HORIZONTAL
*DH1
Question and Answer IconNeed help?

Do you have a question about the Trane *UH1B060A9361A and is the answer not in the manual?

Trane *UH1B060A9361A Specifications

General IconGeneral
BrandTrane
Model*UH1B060A9361A
CategoryFurnace
LanguageEnglish

Summary

SAFETY SECTION

General Safety Practices

Covers essential safety practices and precautions during installation and operation.

Carbon Monoxide Poisoning Hazard

Details critical steps to prevent CO poisoning when placing appliances into operation.

GENERAL INSTALLATION INSTRUCTIONS

LOCATION AND CLEARANCES

Air for Combustion and Ventilation

Combustion Air Requirements

Explains requirements for combustion air based on space type and potential chemical exposures.

Combustion Air Calculations

Duct Connections

General Venting Requirements

Venting System Types and Codes

Discusses direct vent, nondirect vent, positive pressure systems, and relevant codes.

Venting Materials and Connections

Upflow/Horizontal Venting Lengths

Downflow/Horizontal Venting

Venting Length Tables

Lists maximum total equivalent feet for downflow/horizontal vent and inlet air pipes.

Terminal Vent Clearances

Direct Vent Terminal Clearances

Table detailing required clearances for direct vent terminals in Canadian and US installations.

Non-Direct Vent Terminal Clearances

Table detailing required clearances for non-direct vent terminals in Canadian and US installations.

Horizontal Venting Configurations

Venting Installation Details

Downward Venting and Chimney Installation

Condensate Drainage and Furnace Wiring

Field Wiring Diagram (1 Stage Furnace)

Provides a wiring diagram for a single-stage furnace with a thermostat, including notes on power and grounding.

Electrical Connections and Wiring Diagrams

Wiring Diagrams for Heating/Cooling

Illustrates wiring for 1-stage heating/cooling thermostats, noting polarity sensitivity and accessory connections.

Gas Piping Installation

Upflow/Horizontal Gas Piping

Details gas piping installation for upflow/horizontal furnaces, including shut-off valves and drip legs.

Downflow Gas Piping

Outlines gas piping installation for downflow furnaces, covering left or right side options.

Gas Flow and Input Checks

Combustion and Input Verification

Instructions for checking gas flow rate and verifying furnace input against nameplate rating.

Gas Valve Pressure Adjustment

Guides on adjusting manifold pressure using the gas valve's adjustment screw.

Manifold Pressure Settings and Checks

Manifold Pressure Adjustment Procedure

Step-by-step guide to adjusting manifold pressure, including leak checking.

Final Manifold Pressure Settings

Table listing the correct final manifold pressure settings for various furnace models.

High Altitude Operation Adjustments

High Altitude Derate Procedure

Explains how to adjust furnace input rate for installations above 2,000 ft. based on altitude.

Orifice Selection and Lighting

Lighting Instructions and Safety

Provides essential safety warnings and steps for the initial lighting and startup of the furnace.

Furnace Operation and Controls

Troubleshooting Abnormal Conditions

Integrated Furnace Control Error Codes

Related product manuals