IQ23x Series Controllers Installation Instructions TG200539 Issue 2 , 23-Feb-2012 1
Installation Instructions
IQ23x
Series Controllers
Important: Retain these instructions
These instructions shall be used be used by trained service personnel only
If the equipment is used in a manner not specied by these instructions, the protection provided by the equipment may be impaired.
1
Dimensions
2
Mounting Requirements
Altitude: 2000m (6562’)
3 INSTALLATION
3.1 Installation - Mounting
1 UNPACKING
2 STORING
It is recommended that the installation should comply
with the local electrical safety installation practices
(e.g. HSE Memorandum of Guidance on Electricity
at Work Regulations 1989, For USA National Electric
Code).
CONTENTS
1 Unpacking .....................................................................1
2 Storing ...........................................................................1
3 Installation .....................................................................1
3.1 Installation - Mounting ...................................................1
3.2 Installation - Conguring ...............................................5
4 Connecting a Remote 2-Line Display ...........................9
5 Connecting to PC via Supervisor Port ..........................9
6 Connecting to NDP via Supervisor Port .....................10
7 Mounting in an Enclosure, ENCLs/... ..........................10
8 Replacing the Battery ..................................................11
9 Zero Address/Baud Rate Switch Reset ......................13
10 Replacing an IQ111 with an IQ231 ..............................14
11 Replacing an IQ111+ with an IQ231 ............................19
12 Replacing an IQ131 with an IQ233 .............................24
13 Replacing an IQ131+ with an IQ233 ...........................28
14 Installing an Auxiliary Internal Node Board ................32
15 Disposal .......................................................................40
IQ23x Installation
Instructions TG200539
HO
2
+50 °C
0
-10 °C
90 %RH
RX
TX
OK
A
D
DP
C
B
1
2
8
4
16
32
64
1K2
9K6
19K2
ADDRESS
BAUD
93 mm
(3.66”)
339 mm (13.35”)
299 mm (11.77”)

          
  

          
  
123 4 5 6 7 8 9 10
RX
TX
OK
ADDRESS BAUD
SW4
A
D
DP
C
B
 






a
b
c
HO
2
0 °C
+45 °C
0 %RH
90 %RH
d







e











The unit must
be installed in
an enclosure
conforming to
EN61010-1
Question and Answer IconNeed help?

Do you have a question about the TREND IQ23 Series and is the answer not in the manual?

TREND IQ23 Series Specifications

General IconGeneral
BrandTREND
ModelIQ23 Series
CategoryController
LanguageEnglish

Summary

Unpacking and Storing Controller

Unpacking Controller

Steps for safely removing the controller from its packaging.

Controller Storage Guidelines

Recommended conditions for storing the controller before installation.

Controller Installation and Configuration

Installation and Mounting Procedures

Covers physical installation, dimensions, and mounting requirements.

Configuration and Network Setup

Details network baud rate, address setting, and link headers.

Peripheral Connectivity

Remote 2-Line Display Connection

Steps for connecting and testing a remote display unit.

PC and NDP Supervisor Port Connection

Connecting the controller to a PC or NDP via the supervisor port.

Enclosure Mounting Requirements

Procedures for mounting the controller within an enclosure.

Maintenance and System Reset

Replacing the Controller Battery

Step-by-step guide for replacing the controller's battery.

Network Address and Baud Rate Reset

How to reset the network address and baud rate switches.

Controller Replacement Guides

Replacing IQ111 with IQ231

Detailed guide for migrating from IQ111 to IQ231 controller.

Replacing IQ111+ with IQ231

Steps for replacing IQ111+ with IQ231 controller.

Replacing IQ131 with IQ233

Guide for migrating from IQ131 to IQ233 controller.

Replacing IQ131+ with IQ233

Instructions for replacing IQ131+ with IQ233 controller.

Auxiliary Internal Node Board Installation

Auxiliary Node Board Installation Overview

General steps for installing an auxiliary internal node board.

Network and Cable Connections for Node Board

Connecting network cables and power to the node board.

Product Disposal

WEEE Directive and Disposal Guidelines

Guidelines for environmentally responsible disposal of the unit.

Related product manuals