EasyManua.ls Logo

Trimble M3 Total Station - Displaying job information; Editing data

Default Icon
172 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 Basic Measurement Screen
62 Trimble M3 Total Station User Guide
50.1 Instrument height (ih) and station-Z coordinate (Zs)
To input instrument height (ih) and station Z
coordinates (
Zs):
1. Press
[F3] ih/Zs in the STN Elevation screen.
2. Select a method to input Station height.
To input from recorded data, press
[F1]
Internal memory.
To input directly using the keypad, press
[F3]
Input.
3. Input the Zs coordinate. Do one of the following:
Enter the coordinates using the keypad and
then press
[MEAS/ENT].
To use previous input, press
[F3] Stack,
select the required value and then press
[MEAS/ENT].
4. Input the instrument height. Do one of the
following:
Enter the instrument height using the
keypad and then press
[MEAS/ENT].
To use previous input, press
[F3] Stack,
select the required value and then press
[MEAS/ENT].
5. The STN Elevation screen shows the result. Do
one of the following:
To exit the program without saving the
result, press
[F1] No.
To record the result on the screen and finish
the program, press
[F4] Yes.

Related product manuals