EasyManua.ls Logo

Trojan TH-35 - Chapter 6 Nitrogen Gas Recharging; N2 Chamber Recharging Process; Accumulator Recharging Process

Default Icon
21 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10/19
CHAPTER6NITROGENGASRECHARGING
Usually,NitrogenGashasalreadybeenchargedandpressurehasbeenadjustedbeforeleavingfactory ,butitisnecessaryto
checkagainbe forefirstuse.GasPressureshouldbecheckedregularlyeverytwomonths.
6.1N2CHAMBERNITROGENRECHARGING
ScrewoffanticlockwisetheChargingValve’sEndCap,andconnectthe
3wayValvetotheN2Chamber.ShutofftheOverflow
Valve. Keepthe N2 Bottle closed, and press the Switch of 3way Valve to check the pressure. If pressureis too high, please
dischargesomeN2viatheOverflowValve.Ifthepressuretoolow,keeppressingtheSwitch
of3wayValve,meanwhileopen
theN2Bottletochargeuntilproperpressure(around16Bar).ClosetheN2Bottle,andcloseChargingValve’sEndCap.
6.2ACCUMULATORNITROGENRECHARGING
ScrewoffanticlockwisetheEndCap(#9&#11),andconnectthe3wayValveto#9position.
ShutofftheOverflowValve.Keep
theN2Bottleclosed,presstheSwitchof3wayValve,meanwhilelooseanticlockwisetheChargingValve(#12)alittletocheck
thepressure.Ifpressureistoohigh,dischargeit viatheOverflowValve.Ifthepressuretoo low,keeppressingtheSwitchof
3way Valve, meanwhile open the N2 Bottle to charge untilproper pressure (around 60 Bar). Close the N2 Bottle, Charging
Valve(#12),andEndCaps(#11&#9).

Related product manuals