EasyManua.ls Logo

Twin Eagles TEGH48 - Operating Instructions; Initial Start-Up and Remote Synchronization

Twin Eagles TEGH48
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATING INSTRUCTIONS GAS INFRARED HEATER
A) INITIAL START-UP
1) Before you start your heater examine the heater installation to determine that:
Areas immediately around heater including the air inlet and flue areas are free from obstructions.
Physical support of the heater is safe, secure, adequate and sound.
There is no obvious deterioration of the heater, gas inlet hose and AC adapter if used.
2) REMOTE CONTROL SYNCRONIZATION & START-UP TEST:
The remote control leaves the factory already synchronized for each heater. To verify that, with
the heater’s gas inlet valve in the CLOSED position, verify that the remote control system is
working properly.
Push the “ON” button on the remote control. You will hear a continuous spark sound at the pilot.
If there are no sparks, replace the AA batteries with new ones. If with the new batteries there are
still no sparks, synchronization is needed. For synchronization perform the following steps.
Single heater application
I. Push-and-hold the LEARN button on the module for
10 seconds until it “beeps” 3 times.
II. Push-and-hold the ON button on the remote and the
“beep” sound will confirm synchronization.
I. Push-and-hold the “LEARN” button on the module for 10
seconds until it “beeps” 3 times and then remove a
battery. Repeat same step for all heaters.
Multiple heater application
II. Install the battery only to one heater.
III. Push-and-hold the LEARNbutton until it “beeps” once and then push-and-hold the ON
button on a remote control and the next “beep” sound will confirm synchronization.
NOTE: One remote control per heater.
IV. Remove a battery to that same heater.
V. Repeat steps II, III, IV and V for the rest of the heaters and its individual remote controls.
VI. Once the synchronization is completed for all heaters place the battery back on all heaters.
ON
MODULE
“LEARN”