EasyManua.ls Logo

UEBERALL UBK-1 - User Manual

Default Icon
13 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Installations- och driftinstruktion Installation and Operation Manual
UV-system typ UBK UV sterilizer series UBK
© UEBERALL 2007
Sida / Page 1 / 13
Innehåll: Sida
Viktig information 2
Installation av UV-system 3
Installation av UV-sensor 5
Installation av kvartsglas 6
Installation av UV-lampa 7
UV-övervakning 8
Inställningar vid drifttagning 9
Underhåll 10
Felsökningsschema 11
Reservdelslista 13
Bilagor:
Kopplingsscheman
Måttritningar
Content: Page
Important Information 2
Installation of UV sterilizer 3
UV sensor installation 5
Quartz jacket installation 6
UV lamp installation 7
UV monitoring 8
Adjustments for start up 9
Maintenance 10
Fault Finding Table 11
Spare Part Lists 13
Appendix:
Wiring Diagrams
Dimensional drawings
UBK-1
UBK-2
UBK-3
UBK-4
Question and Answer IconNeed help?

Do you have a question about the UEBERALL UBK-1 and is the answer not in the manual?

Summary

Important Information & Safety

Handling Fragile Parts and Glass Surfaces

Details on handling fragile components like lamps, quartz jackets, and sensors.

Function and Warranty Prerequisites

Requirements for correct operation, water quality, and electrical supply.

UV System Installation

UV Reactor and Pipe System Integration

Instructions for installing the UV reactor and connecting it to the pipe system.

UV Sensor Installation

Sensor Window Mounting

Steps for installing the Teflon sensor window and O-ring into the sensor housing.

Sensor Cartridge Installation and Connection

Procedure for inserting and securing the sensor cartridge and connecting the cable.

Quartz Jacket Installation

Quartz Jacket Mounting Procedure

Instructions for installing the quartz jacket, including O-ring and thrust disk.

UV Lamp Installation

UV Lamp Mounting and Connection

Detailed steps for inserting the UV lamp, connecting the cable, and securing the end cap.

UV Monitoring

System Status Indicator Lights

Explanation of the three LEDs (Green, Yellow, Red) indicating system status and alarms.

Start-up Adjustments

Potentiometer Adjustment for Operation

How to adjust the potentiometer on the electronic board for proper system startup.

System Maintenance

Routine Maintenance and Checks

Key checks and tasks for maintaining the UV system, including lamp replacement.

Resetting Operation Hour Meter

Procedure to reset the digital operation hour meter after lamp replacement.

Fault Finding

Troubleshooting Guide Table

A table to diagnose and resolve common system faults based on symptoms.

Spare Parts

Spare Parts Identification List

List of spare parts with part numbers for different UBK models.

UEBERALL UBK-1 Specifications

General IconGeneral
BrandUEBERALL
ModelUBK-1
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals