Do you have a question about the UEBERALL UBK-2 and is the answer not in the manual?
Handling delicate components like UV lamps, quartz jackets, and sensors. Avoid touching glass surfaces with bare hands.
Ensuring correct installation, operation, and matching water/power specifications for warranty validation and optimal performance.
Instructions for installing the UV reactor into the piping system, referencing dimensional drawings for precise placement.
Procedures for installing the sensor window and sensor cartridge into the UV reactor assembly.
Key considerations for unit installation including orientation, service access, mounting, valve requirements, and pressure testing.
Explanation of system status indicators (LEDs) and factors affecting monitoring, such as lamp intensity and water transmission.
Procedures for adjusting the unit upon initial start-up using potentiometer and observing indicator lights.
Checks required for yellow or red alarm indicators, including cleaning quartz jackets and replacing UV lamps.
Procedure to reset the digital operation hour meter after replacing the UV lamp.
| Brand | UEBERALL |
|---|---|
| Model | UBK-2 |
| Category | Laboratory Equipment |
| Language | English |
Loading...