Installations- och driftinstruktion Installation and Operation Manual
UV-system typ UBK UV sterilizer series UBK
© UEBERALL 2007
Sida / Page 1 / 13
Innehåll: Sida
Viktig information 2
Installation av UV-system 3
Installation av UV-sensor 5
Installation av kvartsglas 6
Installation av UV-lampa 7
UV-övervakning 8
Inställningar vid drifttagning 9
Underhåll 10
Felsökningsschema 11
Reservdelslista 13
Bilagor:
Kopplingsscheman
Måttritningar
Content: Page
Important Information 2
Installation of UV sterilizer 3
UV sensor installation 5
Quartz jacket installation 6
UV lamp installation 7
UV monitoring 8
Adjustments for start up 9
Maintenance 10
Fault Finding Table 11
Spare Part Lists 13
Appendix:
Wiring Diagrams
Dimensional drawings
UBK-1
UBK-2
UBK-3
UBK-4
Question and Answer IconNeed help?

Do you have a question about the UEBERALL UBK-3 and is the answer not in the manual?

Summary

Important Safety and Operation Information

UV Radiation Hazards and Precautions

UV radiation can harm eyes and skin. Always wear protective glasses and gloves. Never look at a lit UV lamp.

Handling Fragile Components

UV lamps, quartz glass, and sensors are fragile. Handle with care and avoid touching glass surfaces with bare hands.

Functional and Warranty Prerequisites

Ensure installation, operation, and maintenance follow the manual. Verify pressure, flow, water quality, and power match specifications.

UV System Installation

UV Reactor and Pipe System Installation

Component identification for UV reactor and installation into the pipe system per dimensional drawings.

Installation Procedures and Requirements

Covers vertical mounting, service height, wall mounting, valve installation, and electrical connections.

UV Sensor Installation Steps

Guide for installing the sensor window, sensor cartridge, and connecting the sensor cable.

Quartz Jacket Installation

Instructions for handling, cleaning, and properly inserting the quartz jacket into the reactor.

UV Lamp Installation Guide

Step-by-step process for connecting, inserting, and securing the UV lamp within the unit.

UV Monitoring and Operation

LED Status Indicators

Three LEDs on the switch cabinet indicate normal operation, pre-alarm, or main alarm status.

Electronic Adjustment and Start-up

Adjust the potentiometer for correct operation after warm-up, ensuring the green LED indicates status.

Maintenance and Servicing

Routine Maintenance and Checks

The unit requires minimal maintenance; check UV lamp output and clean components as needed.

Alarm Conditions and Causes

Yellow alarm for dirt, red alarm for major issues like lamp failure or water quality. Resetting alarms.

Operation Hour Meter Reset

Procedure to reset the digital operation hour meter to '0.0 h' after UV lamp replacement.

Troubleshooting Guide

Fault Finding Table

Systematic table to diagnose faults by matching symptoms to potential causes and solutions.

Detailed Troubleshooting Scenarios

Continuation of the fault table, covering additional issues like sensor connection, ballast defects, and vibrations.

Spare Parts Identification

Spare Part List and Numbers

List of spare parts with part numbers for UBK models, referencing manual drawings and wiring diagrams.

UEBERALL UBK-3 Specifications

General IconGeneral
TypeLaboratory Shaker
ModelUBK-3
Capacity3 kg
Speed Range50-300 rpm
Orbit Diameter20 mm
Timer0-120 min
Power Supply220V/50Hz