EasyManua.ls Logo

Unical MODULEX EXT 550 - Positioning in Boiler Room

Unical MODULEX EXT 550
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19
Installation instructions
ENGLISH
3.5 - POSITIONING IN THE BOILER ROOM
Special attention must be paid to the standards and local laws
with regard to boiler rooms, especially the minimum distances
that must be kept free around the boiler.
Installation must comply with the provisions in the most recent
standards and laws in force with regard to boiler rooms, instal-
lation of heating systems and domestic hot water production,
ventilation, suitable chimneys to drain combustion products from
condensate boilers and anything else applicable.
The boiler can be placed on a at and su󰀩ciently sturdy base,
with a size, in the plan, not inferior to that of the boiler and at
least 100 mm high (see gure) in order to be able to mount the
siphon for condensate draining. As an alternative to this base,
a sump can be obtained on the oor, next to the boiler, with a
100 mm depth for housing the siphon (see gure).
When installation has been performed, the boiler must be per-
fectly horizontal and stable (to reduce any vibrations and noise).
Comply with the minimum clearance distances in
order to execute normal maintenance and cleaning
operations.
A
C
B
D
A> 400 mm
B > 400 mm
C = 100 mm
D= 500 mm
Szifon
SIPHON

Related product manuals